Mooring Buoy fabrication for TNK

Currently, AlphaECC delivered a first mooring buoy to TNK for Lantay Platform Facility. This buoy was fabricated, tested and delivered in accordance with local marine regulation on buoy design and saf

Read Full Article

Completion of engineering, fabrication, installation and commissioning for Baria Pipeline Pigtrap and other facilities.

Today, AlphaECC and its subsidiary- APEM (Alpha Petroleum Equipment Manufacture) have successfully completed the final commissioning and startup for Baria Pigtrap and other facilities

Read Full Article

Installation aids contract with SAIPEM

AlphaECC is currently awarded by SAIPEM to perform major installation aids fabrication onshore

Read Full Article

AlphaECC performs the ship block building for SOFEL and PTSC SB

AlphaECC performs the ship block building for SOFEL and PTSC SB

Read Full Article

560 MT topside awarded to AlphaECC- E1A topside

AlphaECC has just received the LOA (letter of award) from Vietsov Petro Oil Company to fabricate and installation of topside E1A, Randong Oil Field, of JVPC (Japan Vietnam Petroleum Company)

Read Full Article

3,400MT Jacket pile fabrication, Biendong Project

It's scope for AlphaECC to carry out overall fabrication, including sea-fastening structure, with engineering design and main plate materials provided by Vietsovpetro, the main contractor of the Proje