Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, S.R. Vietnam
info@alpha-ecc.com

Our Projects


More skid packages for Tegiactrang Oil Development Project

On last January 13, 2010, AlphaECC signed the Purchase Orders with PTSC M&C, EPC contractor for Te Giac Trang Oilfield Development Project which is owned by Hoanglong JOC, to carry out the engineering

Read Full Article

System the Automated Shutdown

The AUTOMATED SHUTDOWN System is an automated shut down control unit used to shut down all equipment used during hot-work operations, in classified areas, where a hydrocarbon atmosphere may be present

Read Full Article

Slug catcher& Open drain equipments signed with Vietsovpetro

Yesterday, AlphaECC successfully signed a contract with Vietsovpetro to engineering, material procurement, fabrication and delivery of 02 equipments of slug catcher and open drain for Rong- Doi Moi Ga

Read Full Article

FPSO Pile fabrication

The 600 tons fabrication for FPSO Anchor Piles has contributed greatly to the project TGT FPSO.

Read Full Article

“Plem for Gas line – HST/TGT-BH” is satisfactorily completed onshore by AlphaECC.

Plem for Gas line – HST/TGT-BH” is satisfactorily completed onshore by AlphaECC.

Read Full Article

3rd drain cassion delivered to ESI for OCNG (India)

This is the 3rd drain caisson delivered to ESI for OCNG project in India. Job was successfully completed under the inspection of client's supervision ad GL India inspection.

Read Full Article
Total : 113 Pages 7/19 : [ 1 ] [ 2 ] [ 3 ] [ 4 ] [ 5 ] [ 6[ 7 ] [ 8 ] [ 9 ] [ 10